Ive taken the last week and stained some 1/4" cherry plywood, and some poplar rails and shelving. Over the last few days, Ive managed to line the interior of the base cabinets. Im also going to install a pull out tray on the left-most cabinet, will full extension guides. I need to do all of this before the countertop goes on. Here are the latest pics!
Minggu, 03 April 2016
Petersburg Mi base cabinet work
Posted on 13.53 by zeri
Ive taken the last week and stained some 1/4" cherry plywood, and some poplar rails and shelving. Over the last few days, Ive managed to line the interior of the base cabinets. Im also going to install a pull out tray on the left-most cabinet, will full extension guides. I need to do all of this before the countertop goes on. Here are the latest pics!
Langganan:
Posting Komentar (Atom)
0 komentar:
Posting Komentar