Were assembling a playground at a school in Toledo! There was nothing but field here, and it took two days on a bobcat to dig out our 60x66 area. It has to be 9" deep everywhere, and 12" deep below the swings and slide. Weve assembled a large jungle jim, a 43 swing set, and a huge slide. My crew of 4 has worked diligently, and we are actually ahead of schedule by a little (considering we doubled the size from the first look at it). All structural posts are set in concrete. This has to be done before the new school year, and weve been driving hard to get it done. Most days have been 9 hours straight, and Id like to give a big shout out to my guys for a job WELL DONE!
Minggu, 20 Maret 2016
Central Academy Playground
Posted on 23.42 by zeri
Were assembling a playground at a school in Toledo! There was nothing but field here, and it took two days on a bobcat to dig out our 60x66 area. It has to be 9" deep everywhere, and 12" deep below the swings and slide. Weve assembled a large jungle jim, a 43 swing set, and a huge slide. My crew of 4 has worked diligently, and we are actually ahead of schedule by a little (considering we doubled the size from the first look at it). All structural posts are set in concrete. This has to be done before the new school year, and weve been driving hard to get it done. Most days have been 9 hours straight, and Id like to give a big shout out to my guys for a job WELL DONE!
Langganan:
Posting Komentar (Atom)
0 komentar:
Posting Komentar