Today, the inset doors for the lower cabinets were hung, the entire unit was sanded down, caulked, and prepped for primer and paint, and the electrical was completed. The unit will be primed in a few days. In the mean time, the owners are picking out crown molding and base, which will be installed after the unit is painted. The switches for the lighting were hidden in the lower left cabinet.
0 komentar:
Posting Komentar